Contact

Lincoln
INSULATION & ASBESTOS SERVICES
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ
FABRICATION
Crofton Drive, Allenby Industrial Estate, Lincoln LN3 4NJ
SCAFFOLDING
Greetwell Road, Lincoln, Lincolnshire LN3 4NH

London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Northampton
7 Edgemead Close, Round Spinney, Northampton, Northants, NN3 8RG

Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Manchester
Unit D21 Fieldhouse Industrial Estate, Fieldhouse Road, Rochdale, OL12 0AA

SCAFFOLDING

Infrastructure, construction &
industrial scaffolding services.

ASBESTOS

Asbestos testing, removal &
management services.

INSULATION

Industrial thermal insulation &
cladding services.

FABRICATION

Metal fabrication services &
industrial painting.


Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Warning: Invalid argument supplied for foreach() in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 22

Case Studies


Warning: Missing argument 2 for get_terms_dropdown(), called in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 51 and defined in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 33

Notice: Undefined variable: args in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 34

SIEMENS GAS PLANT MAINTENANCE

Project: Scaffolding for gas plant maintenance Client: Siemens Industrial Turbomachinery Ltd Location: Lincoln Timescale: 13 – 29 June 2018...

Spofforth Park

Client: Bellway Homes Project: Spofforth Park Location: Wetherby Timescale: 4 1/2 years (quarter of the way through mid 2018) Rilmac Scaffolding will...

Little Cross Street Northampton

Client: Willmott Dixon Project: Little Cross Street Location: Northampton Project Duration: 16 weeks Rilmac Scaffolding are providing access...

Trent Basin Phase 2

Client: Willmott Dixon Location: Nottingham Project: Trent Basin Phase 2 Project Duration: 7 months Rilmac have provided scaffolding services for the...

Boots Pharmaceuticals Nottingham

Client: Boots Pharmaceuticals Location: Nottingham Start Date: Maintenance contact started in 2008 Completion Date: Ongoing Site Manager: Rob Towson...

Remote Radar Head

Remote Radar Head Scaffolding Client: Oslo Engineering Location: Trimingham Project: Remote Radar Head Project Duration: 6 weeks Birdcage scaffold to...