Contact

Lincoln
INSULATION & ASBESTOS SERVICES
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ
FABRICATION
Crofton Drive, Allenby Industrial Estate, Lincoln LN3 4NJ
SCAFFOLDING
Greetwell Road, Lincoln, Lincolnshire LN3 4NH

London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Northampton
7 Edgemead Close, Round Spinney, Northampton, Northants, NN3 8RG

Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Manchester
Unit D21 Fieldhouse Industrial Estate, Fieldhouse Road, Rochdale, OL12 0AA

SCAFFOLDING

Infrastructure, construction &
industrial scaffolding services.

ASBESTOS

Asbestos testing, removal &
management services.

INSULATION

Industrial thermal insulation &
cladding services.

FABRICATION

Metal fabrication services &
industrial painting.


Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Warning: Invalid argument supplied for foreach() in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 22

Case Studies


Warning: Missing argument 2 for get_terms_dropdown(), called in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 51 and defined in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 33

Notice: Undefined variable: args in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case.php on line 34

Acoustic Enclosure EPR Glanford

Acoustic Enclosure EPR Glanford Client: EPR Glanford Ltd Project Location: Scunthorpe Duration: 5 days (working) Contracts Manager: Dave Mason...

Cautley Drive Harrogate

Client: Linden Homes Location: Harrogate Timescale: 2 years approx. Rilmac Contracts Manager: Dean Booth Rilmac Scaffolding are currently providing...

St. Hugh’s Lincoln

Client: Robert Woodhead Location: Newport, Lincoln Timescale: October 2017 – June 2018 Site Manager: Richard Carlton Rilmac Scaffolding have...

St Christopher’s School Case Study

Client: Selmec Ltd (Lincoln) Project: St Christopher’s School Location: Lincoln Duration: 10 days (working) Contracts Manager: Dave Mason...

Poplar Farm School

Client: Wates Construction Location: Grantham Project: Poplar Farm School Project Duration: 8 months Rilmac Scaffolding were contracted by Wates...

Ripley Academy Derbyshire

Project: Ripley Academy Client: Kier Construction Location: Derbyshire Timescale: Nov 17 – Aug 18 Rilmac Scaffolding were responsible for...