Contact

Lincoln
INSULATION & ASBESTOS SERVICES
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ
FABRICATION
Crofton Drive, Allenby Industrial Estate, Lincoln LN3 4NJ
SCAFFOLDING
Greetwell Road, Lincoln, Lincolnshire LN3 4NH

London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Northampton
7 Edgemead Close, Round Spinney, Northampton, Northants, NN3 8RG

Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Manchester
Unit D21 Fieldhouse Industrial Estate, Fieldhouse Road, Rochdale, OL12 0AA

SCAFFOLDING

Infrastructure, construction &
industrial scaffolding services.

ASBESTOS

Asbestos testing, removal &
management services.

INSULATION

Industrial thermal insulation &
cladding services.

FABRICATION

Metal fabrication services &
industrial painting.


Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Warning: Invalid argument supplied for foreach() in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 22

Scaffolding Case Studies


Warning: Missing argument 2 for get_terms_dropdown(), called in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 51 and defined in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 33

Notice: Undefined variable: args in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 34

ALAN HIGGS SPORTS CENTRE

Project: Swimming Pool Client: Galliford Try Location: Coventry Timescale: Total build 13 month. Rilmac not continuously on site. As part of a...

INTEGRATED CARE HUB IN BELPER

Project: Integrated Care Hub Client: Robertson Location: Belper, Derbyshire Value: Total development £8.7M The new integrated care hub in Belper...

GREAT BROUGHTON HOUSING DEVELOPMENT

Project: Housing Development Client: Mulgrave Properties Location: Great Broughton Timescale: Nine months from September 2018 (approx.) Rilmac...

ROOF REPAIR SCAFFOLDING

Project: Roof Repair Scaffolding Client: STB Projects Location: Hatcliffe Building: Barrow House Rilmac Scaffolding were approached by STB Projects...

Roofing for motor sport factory

Client: GF Tomlinson Location: Milton Keynes Project: Roofing to motor sport factory Value: £50k – £75k Timescale: Two months Due to the...

RAIL LINE BRIDGE PROJECT CASE STUDY

Project: Lincoln Bypass Market Rasen Rail Line Client: Galliford Try Value: £120 million (full LEBP project) Timescale: Two years on the full scheme...