Contact

Lincoln
INSULATION & ASBESTOS SERVICES
Crofton Drive, Allenby Road Industrial Estate, Lincoln, Lincolnshire LN3 4NJ
FABRICATION
Crofton Drive, Allenby Industrial Estate, Lincoln LN3 4NJ
SCAFFOLDING
Greetwell Road, Lincoln, Lincolnshire LN3 4NH

London
Unit 4, Ashton Gate, Ashton Road, Harold Hill, Romford, RM3 8UF

Northampton
7 Edgemead Close, Round Spinney, Northampton, Northants, NN3 8RG

Huddersfield
Heritage Exchange, Wellington Mills, Plover Road, Lindley, Huddersfield, HD3 3HR

Manchester
Unit D21 Fieldhouse Industrial Estate, Fieldhouse Road, Rochdale, OL12 0AA

SCAFFOLDING

Infrastructure, construction &
industrial scaffolding services.

ASBESTOS

Asbestos testing, removal &
management services.

INSULATION

Industrial thermal insulation &
cladding services.

FABRICATION

Metal fabrication services &
industrial painting.


Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Notice: Array to string conversion in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-includes/taxonomy.php on line 1055

Warning: Invalid argument supplied for foreach() in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 22

Scaffolding Case Studies


Warning: Missing argument 2 for get_terms_dropdown(), called in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 51 and defined in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 33

Notice: Undefined variable: args in /home/hp3-linc5-nfs2-y/987/1188987/user/htdocs/wp-content/themes/rilmac/rilmac/archive-case-scaffolding.php on line 34

CYPF – Children’s, Young People and Families Unit

The Nottingham Children’s, Young People and Families Unit is a large, low level, NHS building dealing with the treatment of mental health in young...

Nottingham Biosciences

Nottingham Biosciences had an overall value of £25m and was driven by Paul Smith (Willmott Dixon) who in our opinion is a very knowledgeable...

DNRC Swimming pool wall and ceiling works

Swimming Pool at Rehabilitation Centre Project: DNRC Swimming pool wall and ceiling works Client: Interserve Location: Loughborough Time Scale: Two...

RAF Shawbury

RAF Shawbury Client: Kier Construction Location: RAF Shawbury Time Scale: June 16 to July 17 Contracts Manager: Marcus Green Supervisor: Carl Ravey...

Nixon Court Student Accommodation

Student Accommodation Project: Nixon Court Student Accommodation Client: Willmott Dixon Location: Leicester Requirement: 2KNm2 across 22m high,...

KINGFISHER COURT

Company: Kier Construction Duration: 5 – 8 years Project: Housing Development Location: Spalding, Lincolnshire Rilmac Scaffolding have been on site...